|
Pennsylvania Railroad class E3b comprised a pair of experimental B-B-B (AAR) or Bo-Bo-Bo (UIC) electric locomotives. The bodywork and running gear was produced by Baldwin-Lima-Hamilton while the electrical equipment was provided by Westinghouse, who also acted as the main contractor. In 1952 and 1953 the Pennsylvania Railroad took delivery of ten experimental locomotives, six from General Electric and four from Westinghouse. While GE's were all of the same class (E2b), the Westinghouse locomotives were split into two classes. Two locomotives had two three-axle trucks (E2c), while the other two had three two-axle trucks (E3b). The locomotives were scrapped in 1964. ==References== * * 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「PRR E3b」の詳細全文を読む スポンサード リンク
|